top of page

Isle of Lewis

Gaelic Name:

Eilean Leodhais

ISLE OF LEWIS

Current Status:

Type:

Callsign:

In current service with CalMac

Steel MV

MVNP4

IMO:

MMSI:

Launched:

Acquired:

9085974

232002521

18th April 1995

-

31st July 1995

Entered Service:

Disposed:

N/A

Details

Ordered By:

Cost:

Registered:

Launched by: 

Named after:

Caledonian MacBrayne

Glasgow

Princess Alexandra

The most northerly island of the Outer Hebrides of whom name she carries

Dimensions 

Length:

101.25

Draught:

Breadth:

4.19m

18.52m

Gross Tonnage:

6753

Technical

Builders:

Ferguson Shipbuilders Ltd, Port Glasgow

Yard No:

608

Engine Builders:

Mirrlees Blackstone

Machinery:

Mirrlees Blackstone diesel engines
2 x Electric bow thrusters

Speed:

18

Hoist & Lifts:

Remarks:

Capacities 

Passengers:

Cars:

Crew:

Lifeboats:

680

123

32

MES system, FRC and inflatable liferafts

Facilities 

Observation lounge
Cafeteria
TV lounge
Drivers' lounge
Bar
Shop
Passenger lounges
Information desk
Toilets
Disabled lift

Route Timeline

1995 - 2015: Ullapool - Stornoway
2016 - present: Oban - Castlebay

Current, Last or Usual Route

IMG_0988-4.jpg

History

By the early 1990s, after nearly twenty years of faithful service by the Suilven, the Ullapool – Stornoway route was in urgent need of attention. The crossing still took nearly four hours in the hands of the Norwegian import and the old Suilven was beginning to show her age, especially when compared to vessels such as Hebridean Isles, Isle of Mull and Caledonian Isles.

It didn’t come as a huge shock when CalMac announced they were inviting yards to tender for the contract to build a new vessel specifically for the most northerly route in the network. What the route really needed at this point was for a large vessel which was capable of dealing with the many tourist vehicles and coach-borne foot passengers as well as the numerous wagons which required shipment from the mainland. With this in mind, the dimensions of the proposed newbuild were increased from what had previously been the norm; from a width of 15.8m to 18m and a length in excess of 100m. Her increased width meant that there were very few ports she could actually be accommodated at. The new ferry was going to be the largest to sail in the fleet – just as the Suilven had been from 1974 to 1988 when Isle of Mull was introduced.

Ferguson’s of Port Glasgow were awarded the contract and set about constructing CalMac’s new flagship on the slipway, just a stone’s throw from the A78. Motorists using the dual carriageway between Glasgow and Greenock on a regular basis were able to watch the new ship taking shape over the course of a year or so. Up on the slipway she towered over the shipyard buildings. From the road outside, it looked as though the bow of the newbuild was actually poking out over the top of the offices and lying directly over the main road!

Isle of Lewis was launched on 18th April 1995. In terms of appearance she was a further development of the Isle of Mull and Caledonian Isles’ design in that she had a fully enclosed car deck. She was actually the last ship of this design to be built for the company to date. Her passenger accommodation was spread over two decks further up, and one of these decks also incorporated crew accommodation.

Fitting out was carried out a short distance away and by mid July the Isle of Lewis was ready to go. Her sea trials were carried out on the Clyde, where she dwarfed all other fleet members in a style reminiscent of Suilven's arrival in 1974. Her powerful engines gave her a top speed of around 19 knots and allowed a regular service speed of 18 knots. Not only the largest member of the fleet but also now the fastest too. After collecting her gangways and some crew cars, she left Ardrossan in the last few days of July 1995 and proceeded into the Western Isles and the Minch to her new home. Berthing trials were undertaken at Uig, Lochmaddy and Tarbert on the way up to Lewis in order to assess her suitability on the ‘triangle’, should she ever be required to cover there.

New facilities to accommodate the Isle of Lewis had been approved but these were not ready in time for her arrival and entry into service. When she arrived at Stornoway for the first time, she had to edge into what is now the old freight berth. As with the ship she was to replace, the new arrival lay bow-in on Lewis and stern-in on the mainland. Her greater width meant her stern ramp had to be off-set to port, otherwise she could not load from the Ullapool linkspan. Her bow ramp, although in the centre of the ship, had to have its forward section ‘aimed’ to starboard so as to land correctly on the Stornoway linkspan.

Berthing trials were undertaken at both ports and her crossing time was very impressive – around 2 hours and 45 minutes which shaved at least 45 minutes off the previous duration. While she lay in Stornoway on 30th July, her crew committed what many islanders consider the ultimate sin – they worked on a Sunday! Adjustments were made to the bow ramp in an attempt to increase its speed when being raised and lowered. These seemed to be successful and the following day she entered public service, assisting the Suilven with heavy traffic. The older ship stood down on 1st August and lay in Stornoway for a few days while the Isle of Lewis settled in. With no need for back-up cover, Suilven left Lewis for the final time a few days later and a new era began on the Ullapool – Stornoway route.

Initially there were problems in keeping to the new timetable, and the Isle of Lewis did run up to two hours late in the first few weeks of her career, but as her crew became more familiar with the loading arrangements on the huge car deck, faster turn-round times were achieved and by the end of the summer she was able to keep to her schedule.

Isle of Lewis was easily able to accommodate all the traffic demanding shipment. Her vehicle capacity was for upwards of 120 while her spacious passenger decks could comfortably hold nearly 700 passengers. Her car deck was split into two by a central column. Her port side car deck was three lanes wide while that on the starboard side was two lanes wide. Also along each side was a mezzanine deck which could be raised or lowered according to the traffic requirements. Access from the car deck to the passenger areas was via two stairways, one on either side of the hull.
The stairways brought passengers out in the entrance square on deck 4. This was also the area where the passenger gangways were lined up and also housed the vessel’s information desk. Forward of the entrance square was the massive cafeteria which overlooked the bow and occupied the full width of the ship. Heading aft, one found a designated dog area and a truckers quiet lounge before reaching the reclining lounge and bar at the stern. There were four means of access from deck 4 to deck 5. One was from a stairway from the information desk leading up to the port side promenade deck while another one went from the entrance square up to the observation lounge. There was also access from the cafeteria up to the observation lounge near the bow, while towards the aft and on the starboard side there was a stairway from the reclining lounge to the starboard promenade deck.

Open deck space was not something the Isle of Lewis was short of. Deck 5 consisted of the observation lounge at the bow, crew accommodation further aft and also incorporated an open promenade deck stretching right down both sides of the ship from a point immediately aft of the observation lounge, right to the stern. There were also four stairways leading up to the top deck which was again open and provided copious amounts of seating for those passengers either taking advantage of the summer sun, or more often for those brave souls taking on the Atlantic gales which are not unknown at that particular latitude… The only feature that the ship could have done with which would have been a big popularity winner would have been to include an open deck forward of the observation lounge so that passengers could take in the scenery outside and not be stuck in the lounge.

The new ferry’s schedule called for two sailings a day from September to May and then three sailings daily during the high summer timetable in operation during June, July and August. Of course, Sunday sailings were still not included in the timetable due to local objections among some islanders, despite annual calls for seven-day sailings from others. With the exception of a few relief or additional sailings on the Uig – Tarbert – Lochmaddy routes and her first ever visit to Oban on the morning of Saturday 18th February 2006 (for refueling purposes), the Isle of Lewis has not sailed on any routes other than her own. For her first few winters, when she sailed for annual overhauls, her space was taken by the smaller Isle of Mull for around three weeks, although from 1998 the favoured relief ship was slightly larger, in the shape of Clansman. Neither vessel was as popular due to their slower speeds, but at least Clansman was able to complete the crossing in 3 hours 15 minutes.

An interesting problem did arise shortly after the Isle of Lewis arrived. Over the years, many passengers did complain about a loud banging noise which could be heard in rough weather and some were worried by this. The root of the problem lay in the shape of the vessel’s underside and her lower bow. The banging was caused by waves hitting the bow at an awkward angle which itself was a result of the vessel’s greater width. Another complaint, really from the outset but voiced more often in recent years was the fact that, although she was the fastest ship of the fleet, she could still only sail at 18 knots. What the regular users really wanted was a ship that could achieve 21 or 22 knots and complete the crossing in a little over two hours. There was speculation that she would be re-engined in recent years but those rumours amounted to nothing.

During her time in charge of the Stornoway run she seldom left the Minch other than for her annual overhauls. She did on occasion visit Lochmaddy but it was 2015 before she really got the chance to sample life outwith the Minch. The new Loch Seaforth entered service in February 2015 and the Isle of Lewis was relegated to back-up vessel while any teething troubles were ironed out on the new ship. There were rumours that she was to be sold out of the fleet, however these proved unfounded. She was in fact kept at Stornoway for the summer to provide additional sailings to meet demand created by the new RET fare structure. In the spring of 2015 when the Ullapool linkspan was lifted out and replaced, Isle of Lewis found herself performing a temporary service between Stornoway and Uig on Skye, while the new ship carried only foot passengers to Ullapool. Such was the shallow nature of Uig Bay, a special timetable had to be created to fit around high tide there.

Later on in 2015 Isle of Lewis left for a tour of the major ports in the network, as Finlaggan had a few years prior. She called at Tarbert, Lochmaddy, Castlebay, Craignure, Oban, Campbeltown, Brodick and Ardrossan for berthing trials to assess her suitablilty on other routes. Her greater width was going to cause problems at some locations however it was established that with a new bow ramp outer portion (aimed to port instead of starboard) the problem would be lessened.

The new ramp was constructed and fitted during her 2016 overhaul and she was ready for her new assignment. As part of a major shake-up in services to the Outer Isles, Barra and South Uist were to be served by dedicated vessels; Lord of the Isles operating from Mallaig to Lochboisdale and Isle of Lewis on a daily service between Oban and Castlebay. She would be based at Barra overnight and her crossing time was 4 hours 45 minutes - shaving a mere 5 minutes off Clansman's time.

In the spring of 2019 Isle of Lewis was called upon to provide relief sailings between Oban and Craignure as part of a complicated set of schedules brought about by a breakdown of the Clansman. On her inward sailing from Barra she would call at Craignure and fill up with Oban-bound traffic. Upon arrival in Oban she would then load up and carry one return trip to Craignure and then carry out a delayed sailing back to Barra. This was all to free up the Isle of Mull to take Coll/Tiree sailings and to take the pressure off the much smaller Coruisk. Loading at both Oban and Craignure was via the bow so extra time was required (not everyone on the roads is confident at reversing onboard).

Gallery

Add a Title

Describe your image

Add a Title

Describe your image

Add a Title

Describe your image

Add a Title

Describe your image

Add a Title

Describe your image

Add a Title

Describe your image

bottom of page